sailing Foudra MRP
Reference chevron_rightparts/new

New part

Creates one part. The stock number is allocated automatically as the next free number in the chosen category; category and stock number cannot change afterwards, because the part number is what everything else points at.

Fields

Field Meaning Values
Category Which stock category the part belongs to; it supplies the first segment of the part number One of the categories, not a section
Stock number The middle segment of the part number Allocated automatically on create (next free in the category); shown read-only on edit
Name Short, what you'd say on the phone Required
Description Longer detail, Markdown — tables work, so technical specifications go here Optional
Part type What kind of thing it is; drives which cards and actions the part page shows raw_material (bought, consumed by the metre/kg), purchased (bought, fitted as is), sub_assembly (made here, goes into something), finished_good (made here, sold)
Unit of measure How it is counted each, metre, kg, litre, sheet, …
Stocked Whether it is held on a shelf between being made and being used On for almost everything. Off makes it a phantom: built inside a work order and consumed by the next step without ever being shelved; BOM explosion passes through it
Minimum stock The reorder point. At or below this (counting what is on order) the part appears on replenishment and raises a stock.low task Blank or 0 means never flagged
Maximum stock The level replenishment tops up to when set Optional
Lead time (days) How long from ordering (or starting) to having it Optional; suppliers and routings carry their own
Standard cost The planning figure in company currency: what BOM costing assumes. Deliberately separate from what any purchase actually cost Optional decimal
Notes Anything else Optional
Active Inactive parts stay for history but are hidden from pickers

See the part page for what each value does once saved.